Elestre onCloud

European AI that regenerates buildings to create
mini AI data centres, eco-sustainable.

As powerful as the biggest. As light as no other. And your data stays in Europe.

And it costs over 170 times less.

We bring together technological innovation, environmental sustainability and social cohesion.

Three principles, one machine: the same efficiency that cuts costs also cuts waste and gives value back to communities.

01

Innovation

An AI all our own, the most efficient in the world, that fits in very little space.

02

Sustainability

Air cooling, renewable power, existing buildings: zero extra environmental impact.

03

Social cohesion

Urban regeneration and social housing within the very same refurbished buildings.

The Ele 5 model · Ele 5

Our AI already exists.

An AI with the quality of the biggest, working in a module the size of a napkin and drawing power like an old light bulb.

Ele isn’t a promise: you can use it today. How we made it so light remains our secret. What matters is the result: the quality of the biggest AIs, without compromise. And that’s why one of our data centres costs half a million instead of 85 million: everything else starts here.

Ele 5One model for everything, the most efficient in the world
Languages it understands
29
Power of one of our data centres
15 kW
Formats in a single model
5
Efficiency ranking
1st

Inside Ele

Two engines, written by us line by line.

One makes Ele work, the other makes it grow. You can’t buy them: we invented them just for it.

01

The engine that makes it work

Quick answers when that’s enough, deep reasoning when it’s needed. The rest is our secret.

02

The engine that makes it grow

It teaches Ele new things for very little, and makes it better at every step. How stays within our walls.

Efficiency

World-leading in efficiency. And not by a little.

Size for size, no other model delivers as much as Ele 5. For you, that means first-class answers at a cost no one else can match.
#ModelEfficiency
  1. 1
    Ele 5first in the world
    0,490
  2. 2
    2nd model
    0,317
  3. 3
    3rd model
    0,240
  4. 4
    4th model
    0,239
  5. 5
    5th model
    0,223

Efficiency: how much quality a model gives for its size. The same public scores and the same method for every model compared.

1,5×

More efficient than the second

in the ranking, size for size.

1ª

Efficiency ranking

among models with public scores.

84,1/100

Understands images

photos, charts and documents, at university level.

84,4/100

Knows and reasons

on complex subjects, with reliable answers.

And it’s good at everything else: it writes code, solves maths problems, understands 29 languages, follows long instructions and uses tools on its own.

The problem · today

Today, AI data centres weigh on the world.

To run AI, huge warehouses are being built that demand energy, water and years of construction. The more AI grows, the more they grow too.

The AI data centre of today.
Electrical power
1,4 GW
Water use
2m L/h
Footprint
70.000 m²
Build time
72 months
Build cost
€50bn
01

Energy

The energy of a whole city, drawn from a single power grid.

02

Water

Millions of litres an hour to cool the machines.

03

Land and landscape

Warehouses of tens of thousands of square metres, on new land.

04

Time and cost

Years of construction and billions of euros, in a single place.

05

Noise

A constant hum, day and night.

06

Diesel in reserve

Diesel generators always on standby, with thousands of litres of fuel.

07

Polluted air

When the generators start, the air around them suffers.

08

The neighbours

Noise, traffic and building work change life in the surrounding neighbourhoods.

The figures are those of a large, new-generation European AI campus. The effects listed have been reported in the news in recent years.

The solution · 15 × 15 × 5 cm

The very same work. In a module that fits in your hand.

Our mini data centre does the same work as a large AI data centre. Without water, without diesel, without noise, without building anything new.

15 × 15 × 5 cm

0 L

water, air cooling

0

diesel generators

0 m²

new land, in existing buildings

15 kW

of power, not 3 MW

~6 months

to build, not 72

To serve 15,000 people: a large AI data centre against an Elestre mini data centre.

Machine and build cost

€ 85 M€ 500 K

170×

Electrical power drawn

3 MW15 kW

200×

Space taken by the machines

150 m²2 m²

75×

Build time

~72 months~6 months

12×

Cooling, water used

Water, huge consumptionAir

0 L

today150 m²Elestre2 m²75 times less space

The same work, for the same 15,000 users, in two square metres instead of a hundred and fifty.

To scale: 150 m² against 2 m² of machines. These are project estimates.

This is what we’re building: not an AI to invent, because it already exists, but a network of small data centres, to repeat city after city, across Europe.

Transparency note: Elestre describes a project under development. Costs, power, space and timings are project estimates for 15,000 people, not guaranteed results; the m² are the space taken by the machines. The comparison is with a large, new-generation European AI campus. The estimates come from our own tests and calculations, not from guesswork.

Choosing Ele pays off. For the planet too.

With Ele you use AI as much as you like, on our machines, instead of paying for it by usage. Here’s how much is saved in a year, in money and resources, for every 15,000 people.

1.98m €

Not spent per use

compared with an AI of the same class paid by usage.

288t CO₂

Emissions avoided

tonnes of CO₂e less in a year.

1.3m L

Water saved

≈ 1,296 m³ of water to cool the machines.

13.7Ktrees

Equivalent trees

the CO₂ they absorb in a year (~21 kg each).

Transparency note: these are estimates, with a transparent calculation. It starts from how much a typical active person works with AI (about2 million words and symbols a month) and from public factors on energy, grid emissions, cooling water and the usage price of an AI of the same class: the same ones you find in the app. Trees are the CO₂ avoided divided by how much one tree absorbs in a year (about 21 kg): an equivalent, not trees planted.

The same building, split in two: yesterday’s ruin and, on that very roof, the AI network bringing it back to life.

Where they’re born · regeneration

Small enough to fit in any building.

No new warehouses: our data centres are born inside buildings that already exist, and bring them back to life. Air-cooled, powered mostly by renewable energy.

Where there’s more space than the machines need, the same building offers homes at affordable rents. The data centre and the neighbourhood’s revival are born together.

01

Regeneration

Abandoned buildings come back to life, with no land consumed.

02

Renewables

Mainly green power, air cooling.

03

Social housing

The spare space becomes homes at sustainable rents.

04

Repopulation

Urban regeneration of otherwise abandoned areas.

Sovereignty · data in Europe

What European AI really means.

Your data stays in Europe, and European rules are written into the product. No one outside gets their hands on it.

The thesis

Being “European AI” isn’t a slogan: it’s owning, physically, the infrastructure that AI runs on.

01

Data in the EU

Physical and legal residence of the data on European soil.

02

European rules, from day one

European rules are written into the product, not added later.

03

Own infrastructure

The machines are ours: no one outside decides for us.

The context

Almost all the AI we use every day is born outside Europe, and even those who build it here bet on a few giant centres. We do the opposite: many small data centres of our own, close to the people who use them. The difference isn’t the flag: it’s the machines.

The market · €400bn · €42bn

An infrastructure Europe doesn’t have yet.

AI grows in Europe every year, but a truly European alternative is missing. Millions of businesses, institutions and people are looking for it: it’s the one we’re building.
400bn €

EU data-centre investment

by 2031, up from €5.3bn in 2026.

42bn €

EU AI investment

by 2031, up from €11bn in 2026.

33m

European SMEs in the target

plus 100,000 local authorities and 150,000 public offices.

450m

Reachable citizens

the entire population of the Union.

Road map · Years 0 → 5

From the first node to the European network.

It starts today, with a single data centre, and grows year after year into a network that covers Europe.
  1. year0

    Today, the first data centre

    The network starts here, from a single node. You are here.

  2. year1

    The first node live

    Businesses and developers, 5,000 people.

  3. year2

    51 data centres

    Businesses and people, 500,000 users.

  4. year3

    2,000 data centres

    Across Europe, 20 million people.

  5. year4

    10,000 data centres

    60 million people.

  6. year5

    20,000 data centres

    100 million people.

The path of our growth plan: projections, not guarantees.

Try Ele, now.

Create your account in seconds and start working with Ele: chat, documents, images, music and video. Early access places are limited.

Elestre is a project by Asincrona S.r.l.

Early access

Step into Elestre, just one tap

Early access to Ele 5. Simple, fast and no credit card.

By continuing you accept Elestre’s privacy policy and terms of use.